![]() ![]() ![]() |
Kennesaw Mountain Battlefield National Park Trails Work Day![]() | |||||||
The Basics: | |||||||
Event Type: | ![]() | Volunteer | ![]() | ||||
Event Location: | ![]() | Kennesaw National Battlefield Park - Old 41 Overflow Parking Lot | ![]() | ||||
Date(s) & Time: | ![]() | Sat, Jun 9 2018 8:00 am >> Sat, Jun 9 2018 12:00 pm | ![]() | ||||
Registration Opens: | ![]() | Mon, May 28 2018 8:00 pm | ![]() | ||||
Registration Cut Off: | ![]() | Sat, Jun 9 2018 6:00 am | ![]() | ||||
Event Duration: | ![]() | 4 Hours | ![]() | ||||
Difficulty Rating: | ![]() | D3: Moderate | ![]() | ||||
Pace: | ![]() | Moderate | ![]() | ||||
Trip Leader(s): | ![]() | Gayle M.![]() You must be logged in to get the Trip Leader contact information. | ![]() | ||||
Member Cost: | ![]() | None | |||||
Participant Info: | |||||||
Who's Invited: | ![]() | Members Only, 21 And Older Only | ![]() | ||||
Maximum Group Size: | ![]() | 20 | |||||
Minimum Group Size: | ![]() | 2 | |||||
Number Registered So Far: | ![]() | 3 / 0 (To see who's signed up, log in to the Member Area) | |||||
Are Dogs Permitted: | ![]() | No | |||||
Itinerary: | |||||||
Let's show some love for the trails we so love!!! Volunteers perform trail maintenance on the 20+miles of trails at the Kennesaw Mountain National Battlefield Park. Kennesaw Mountain Trail Club provides Crew Leader supervision, tools, work gloves (or bring your own), water and snacks. Volunteers should wear work clothes and comfortable closed toed shoes. We will stay together working as a group & following the instructions of our Crew Leader. We will learn the procedures of how to make our trails better for today & for the future. Arrive by 8:00 am to allow time for sign-in, and getting to the Ampitheater (Visitor Center picnic area) which is 5-10 minute walk from the overflow parking lot. We will group near the registration table at the overflow parking lot.
This is the write-up by the Kennesaw Mountain Trail Club: Work Plan June 9, 2018 Trail Day
June 9, 2018 Trail Work Day Plan
The work will consist mostly of more trashing the trail creep erosion, out sloping the trail in places, removing trip hazards, and finishing up some of the work from last month.
We will be working in two areas this work day, both the Mountain Trail and the 24 Gun Trail. Both Trail plans can be down loaded below.
Mountain Trail work plan - Work for this month will again be on the lower portion of the Mountain Trail below the fire road, hopefully for the last time (exceptor future fence). Since most of the heavy work inthe trail limits is completed, work will be under traffic. If working in the trail, asusual, trail workers should call out “Hiker” and work can stop to let hikers pass.
Work for this month will be the bridges on the 24 Gun Battery trail.
Next KMTC Trails Work Day is on Saturday, July 14th.
VOLUNTEER!! YOUR PARK NEEDS YOU!!
Please dress for work. All tools, material and equipment are provided. KMTC has used gloves for your use during work (you may choose to bring your own). We also provide water and snacks. Be prepared to hike to and from the work site. We're looking forward to a safe and productive Trail Day.
Thank you for your participation and support in saving our trails for our enjoyment & for future generations!!!
VOLUNTEER!! YOUR PARK NEEDS YOU!! Volunteers should wear work clothes and comfortable closed toed shoes. | |||||||
| |||||||
How to Get There: | |||||||
Event Directions: | ![]() | Kennesaw Mountain Old 41 Overflow Parking Lot Old Hwy 41 (near Stilesboro Rd) GPS Coordinates - | ![]() | ||||
Notes: | |||||||
* We encourage all members to follow our Etiquette Guidelines while participating in AOC events. | |||||||
Cancellation/Partial Attendance: Please review the AOC cancellation policy. |